25
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
................................................................................................ 27
•
2. Moving the programming unit to the maintenance position
.......................................... 27
•
............................................................................................... 27
•
................................................................................................. 31
•
•
............................................................................................... 33
•
7. Filling the DHW cylinder on the DHW side
...................................................................... 34
•
•
•
8. Checking the connections on the heating water and the DHW side
............................. 34
•
9. Naming the heating circuits
.............................................................................................. 34
•
•
11. Converting the gas type (only for operation with LPG)
.................................................. 35
•
•
•
12. Checking the static pressure and supply pressure
........................................................ 35
•
•
•
13. Function sequence and possible faults
........................................................................... 36
•
14. Setting the max. heating output
........................................................................................ 37
•
•
16. Adjusting the pump rate of the integral circulation pump
............................................. 38
•
17. Checking the balanced flue system tightness (annular gap check)
............................. 40
•
•
•
19. Checking the burner gasket and burner gauze assembly
.............................................. 42
•
•
20. Checking and adjusting the ignition and ionisation electrodes
.................................... 43
•
21. Cleaning the heating surfaces
.......................................................................................... 43
•
•
22. Checking the condensate drain and cleaning the trap
................................................... 43
•
•
•
•
24. Checking the neutralising system (if installed)
•
25. Checking the anode connection and anode earth current with an anode tester
•
26. Draining the boiler on the DHW side
................................................................................ 46
•
27. Cleaning the loading cylinder
........................................................................................... 47
•
28. Checking and replacing the protective magnesium anode (if required)
•
29. Re-assembling and filling the loading cylinder
............................................................... 49
•
•
30. Checking the diaphragm expansion vessel and system pressure
................................ 50
•
31. Checking the pre-charge pressure and the DHW expansion vessel (if installed)
•
•
•
32. Checking the safety valve function
•
•
•
33. Checking the electrical connections for firm seating
•
•
•
34. Checking gas equipment for leaks at operating pressure
............................................. 51
•
•
35. Checking the combustion quality
..................................................................................... 51
•
•
•
36. Checking the flue system for unrestricted flow and leaks
•
•
•
37. Checking the external LPG safety valve (if installed)
•
38. Matching the control unit to the heating system
............................................................ 53
•
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6130884