Control Connections
Conduit holding clips
42
Power/Pump Module Installation
1.
Remove cover of power/pump
module. Using the four screws
supplied, mount power module base
as shown next to Vitodens boiler.
Mount power/pump module in
vertical or horizontal position only.
DO NOT mount module on the
ceiling or where it can be exposed to
splashing water.
When installing, note length of
plastic conduit and ensure that
conduit and cable are not under
tension after the installation.
2.
Run conduit alongside or underneath
enclosure of Vitodens 200 boiler.
Plug-in connections
,
20A
,
Plug-in connection
Strain relief
3.
Make plug-in connections
,
,
20A
,
and apply strain relief to
cables.
Conduit must enter bottom of
Vitodens enclosure in the same
location as piping connections.
H
If conduit is routed alongside
boiler, secure to wall, using the
supplied conduit holding clips.
H
If required, coil conduit underneath
boiler enclosure and secure to
boiler frame, using the supplied
wire ties.
5285
960
v1
.2
IMPORTANT
IMPORTANT
Содержание Vitodens 200 WB2 11-44
Страница 51: ...51 5285 960 v1 2...