12
As the user of new combustion equipment, you may be
obliged to notify your local flue gas inspector of the
installation [check local regulations]. Your local flue gas
inspector will also inform you [where appropriate]
about work that may have to be carried out on your
combustion equipment (such as regular checks, clean-
ing).
Your system is preset
Your heating system is preset at the factory and is
therefore ready for operation following commissioning
by your contractor:
Central heating in weather-compensated operation
■
Between
06:00 and 22:00
, rooms are heated to
20 °C (
"Standard"
temperature level).
■
Between
22:00 and 06:00
, rooms are heated to 3 °C
(
"Reduced"
temperature level, frost protection).
Central heating in constant operation
■
Between
06:00 and 22:00
, the set flow temperature
is 60 °C (
"Standard"
temperature level)
■
Between
22:00 and 06:00
the set flow temperature
is 20 °C (
"Reduced"
temperature level, frost protec-
tion)
Central heating in room temperature-dependent
operation
■
The rooms are heated in accordance with the set-
tings on your room temperature controller.
DHW heating
■
Between
05:30 and 22:00
, the DHW is heated to
50 °C (
"Standard"
temperature level). Any installed
DHW circulation pump is switched on.
■
Between
22:00 and 05:30
, the DHW cylinder is not
reheated. Any installed DHW circulation pump is
switched off.
Note
Any DHW heating started before 22:00 remains on
until the set DHW temperature has been reached.
Frost protection
■
Your heat generator and DHW cylinder (if installed)
are protected against frost.
Wintertime/summertime changeover
■
This changeover is automatic.
Date and time
■
The date and time were set by your heating contrac-
tor.
You can change the settings at any time to suit your
individual requirements.
Power failure
All settings are retained if there is a power failure.
Introductory information
Commissioning
(cont.)
6172108
Содержание Vitodens 200-W System
Страница 71: ...71 6172108...