53
5600 332 v1.3
Vitodens 100-W, WB1B Installation & Service
Necessary Tools
Start-up, Inspection and Maintenance
Special items
g
Approved leak detection fluid for natural gas
g
Pipe joint sealant
g
Garden hose for bleeding boiler heat exchanger
and pressure testing
Cleaning supplies
g
Plastic hand brush
g
Rags
Testing/analysis equipment
(use only calibrated equipment)
g
Multimeter to measure 0 - 12A, 120V and
W
resistances
g
Flue gas analyzer to measure % CO
2
or O
2
(i.e. Bacharach fluid samplers or suitable electronic
flue gas analyzer)
g
Manometer to measure gas pressure 0 to 11 “w.c.
(accurately) and up to 28 “w.c. gas pressure (or a
non-electric Magnehelic® manometer may also be
utilized)
g
Stack thermometer 0 to 500° F (0 to 260° C)
g
Bacharach calculator or suitable tables to calculate
standard (non-condensing) efficiency
g
Carbon monoxide measuring equipment 0 to 400 ppm.
Control and display elements
The control unit is preset at the factory for standard
operation. Your heating system is ready for use. The
factory presets may be individually adjusted to suit your
specific requirements.
Legend
A
Pressure gage
B
LCD display
C
“
” Selector dial for DHW temperature
D
“
tr
” Selector dial for boiler water temperature
E
ON / OFF switch
F
Gas shut-off valve
Overview of Controls and Indicators
Legend
A
Heating mode pump output “ON” (when RT is closed)
B
DHW mode pump output “ON” (when DHW is closed)
C
Boiler water temperature in °F or fault code
D
Units for boiler water temperature measurement
E
Service mode
F
Current burner firing power rate
G
Burner in operation indicator
H
Fault indicator
I
Comfort function started
J
Comfort function stopped
Lift flap and pull control unit cover down. All boiler
controls are located behind the control unit cover.