After completing the last setting, the ‘End’ symbol appears in the display. Confirm with ‘OK’ to start the flue gas  
temperature sensor test and ‘Fst’ is shown in the display. The system carries out a restart.

The system is now ready for operation. You can set maintenance 
intervals via the Vitoguide app if boiler is connected to the Internet.

Hydraulic Scheme

B0KA Combi 

B0HA System

1 Heating circuit without LLH

ü

ü

3 Heating circuit without LLH + DHW cylinder

ü

 

C.9:   

If you selected weather compensated operation in step C.7, then step C.9 allows you to select which  
heating circuit is externally controlled. 

Options: 0 

=

 no external heating circuit (HC) request  

                1 

=

 

only for external HC1 (direct heating circuit) request

 C.6

:   To specify the length of the flue system, select the desired length in 1 metre increments. The maximum flue 

length depends on the flue system and diameter. Each flue bend of 90 degrees after the boiler, adds 1 metre.

 

C.7

:   To specify the operating mode of the heating control, select from the options shown and press OK.  

Options: 4

 =

 Weather compensated operation

  

               

13

 = Constant flow temperature with external time and temperature control  

               

14

 = OpenTherm (only one direct heating circuit) 

 

C.8

:  Step C.8 is only for System boilers.  To specify the appropriate hydraulic scheme, for example, if you have a

 

 

system with an unmixed heating circuit without a low loss header, then please select hydraulic scheme option 1.