Vitocrossal 200 CM2 186 to 311 Service
Steps – Commissioning, Inspection and Maintenance
(continued)
Reducing operational input (if required)
To implement the changes the burner has to be in
stand-by, Status “0”, Service “0”.
The maximum operational input of the burner can be set
to between 0 and 100 % if necessary:
“100“ = 100% = upper heating input,
“0“ = 0% = lower heating input
1. Press button
S
F
and hold for longer than 2 seconds
and
“ “
in the display area
D
will flash.
2.
Press button
Y
E
until “6” appears in the service
display
B
.
3.
Press button
S
F
, until “6” appears in the status
display
A
.
4.
Press button
S
F
and
“1“ will appear in the status
display
A
and the current value for the maximum
operational input is shown in % in the service
display
B
.
5. Press button
Y
E
or
B
G
for the required maximum
operational
input.
6. Press button
S
F
to confirm. If applied successfully,
“1“ will be shown in the
service display
B
.
If the adjustment failed, service display
B
will show “0”.
7. Press button
S
F
to switch to the operating display.
8. Press button
R
C
for more than 2 seconds and the
system restarts and the settings will be applied.
WARNING
Ensure that there is no open flame in the room.
WARNING
Never purge a gas line into a combustion chamber. Never
use matches, candles, flame, or other sources of ignition
for purpose of checking leakage. Use a soap-and-water
solution to check for leakage. Failure to follow this warning
could result in fire, explosion, personal injury, or death.
IMPORTANT
The burner is automatically ignited and starts operation
after a safety time has elapsed.
During initial start-up, the unit may indicate a fault because
of air in the gas supply pipe (especially for liquid propane gas).
After approximately 5 seconds, press the reset button R
C
to reset the burner. The ignition procedure is repeated.
This boiler employs a direct spark ignition system.
1. Close the gas shut-off valve.
2. Undo the screw inside test nipple
A
.
Do Not Remove.
3. Connect the pressure tester at test nipple
A
.
4. Open the gas shut-off valve.
5. Check the static pressure (max. 14“w.c.).
6. Record the actual value in the “Maintenance Record“
in this manual.
A CO measurement (see page 16) must be taken before
and after working on gas appliances to eliminate risks to
health and to guarantee the satisfactory condition of the
system.
IMPORTANT
Checking the static and the supply pressure
Note:
Each time the burner restarts, the setup parameters,
max. output, gas type and altitude will show up on
the display as in the table below.
Commissioning, Inspection and Maintenance