8
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checks
.................................................................................................................................
9
•
2. Filling the DHW cylinder on the DHW side
......................................................................
9
•
•
3. Filling the DHW cylinder on the solar side
......................................................................
9
•
•
4. Inspection and maintenance
.............................................................................................
9
•
•
5. Shutting down the system
.................................................................................................
9
•
•
6. Checking the safety valve function
•
•
7. Cleaning the inside of the DHW cylinder
......................................................................... 10
•
•
8. Checking and replacing the magnesium anode (if required)
......................................... 10
•
•
9. Returning the DHW cylinder to use
.................................................................................. 11
•
•
10. Checking connections on the water side for tightness
•
•
11. Checking the thermal insulation of the cold water and DHW pipes
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5786 170 GB
Содержание TS1