11
10-15°
B
A
Fig. 4
1.
Push turbulators
A
approx.
¼
of their length into
hot gas flues
B
.
2.
Bend turbulators approx. 10 to 15°.
3.
Push the turbulators into the hot gas flues as far as
they will go. When doing this, check the pre-stress-
ing.
Note
Ensure that the turbulators cannot easily be pulled
out of the hot gas flues.
Securing the boiler door and cleaning cover
Note
On gas burners, disconnect the gas supply pipe.
Danger
Escaping gas leads to a risk of explosion.
Check all gas connections for tightness.
4x
A
Fig. 5
Torque
Screws
A
, boiler door
25 Nm
Screws, cleaning cover
7 Nm
Danger
Leaks can result in a risk of poisoning through
escaping gas.
Check gaskets carefully.
Commissioning, inspection, maintenance
Inserting the turbulators
(cont.)
5461424
Содержание PV1B
Страница 16: ...16 Commissioning inspection maintenance Operating and service documents cont 5461424 ...
Страница 30: ...30 5461424 ...
Страница 31: ...31 5461424 ...