NC-Box terminal box
X2 230 V~ terminal strip
■
Power supply 1/N/PE 230 V/50 Hz across
X2.1 and X2.2 via on-site power distribution
board
■
Switching the NC-Box (NC signal) across
X2.3 and X2.4 by the heat pump control unit
X5 Terminal strip for earth conductor
B
Power distribution board (on-site)
C
Heat pump control unit
D
Mains isolator (optional)
E
Fuse F1 (max. 16 A)
F
Power supply 1/N/PE 230 V/50 Hz
Closing the NC-Box
Fit in reverse order to Fig. 3 on page 8.
Installation sequence
Power supply
(cont.)
5675 869 GB
Installation
Содержание NC-Box
Страница 17: ...17 Commissioning and adjustment Commissioning and adjustment cont 5675 869 GB Commissioning ...
Страница 22: ...22 0002 0003 0005 0007 0006 0001 0008 0009 0010 Fig 11 Parts lists Electrical equipment 5675 869 GB Components ...
Страница 24: ...24 0002 0003 0001 Fig 12 Parts lists Connection set 5675 869 GB Components ...
Страница 31: ...31 5675 869 GB ...