8
2.
1.
1.
Fig.3
Note
Should there be insufficient space for working, front
casing part
B
can also be removed. First, remove
casing cover
D
and pull out the panel with cable
entries
E
.
A
Terminal box
B
Front casing part
C
Power cable, heat pump connecting cables (NC
signal) and contact humidistat (connected at the
factory)
D
Casing cover
E
Panel with cable entries and strain relief fittings
Hydraulic connection
To prevent corrosion damage, provide all hydraulic
pipes with thermal insulation as vapour diffusion-proof
installation (on the brine and cold water sides) in
accordance with current engineering standards.
Preparation for retrofitting
1.
Close ball valves and sliders.
2.
Open the primary circuit (brine) and the secondary
circuit (heating water) at a suitable position and
drain the heat transfer medium.
Installation sequence
Opening the NC-Box
5675 869 GB
Installation
Содержание NC-Box
Страница 17: ...17 Commissioning and adjustment Commissioning and adjustment cont 5675 869 GB Commissioning ...
Страница 22: ...22 0002 0003 0005 0007 0006 0001 0008 0009 0010 Fig 11 Parts lists Electrical equipment 5675 869 GB Components ...
Страница 24: ...24 0002 0003 0001 Fig 12 Parts lists Connection set 5675 869 GB Components ...
Страница 31: ...31 5675 869 GB ...