11
1.
Fig.5
A
Flow, heating/cooling circuit or separate cooling
circuit
B
Contact humidistat 24 V
–
C
Terminal box
D
Power cable and heat pump connecting cable (NC
signal)
E
Panel with cable entries
F
Contact humidistat connecting cable
1.
Fit the contact humidistat above the NC-Box to the
flow of the heating/cooling circuit or the separate
cooling circuit. If necessary remove parts of the
thermal installation in order to provide direct contact
with the pipe.
2.
Thermally insulate all lines on site with vapour diffu-
sion-proof material. Thermally insulate the pipe
joints and the area around the contact humidistat
with vapour diffusion-proof adhesive tape.
Installation sequence
Hydraulic connection
(cont.)
5675 869 GB
Installation
Содержание NC-Box
Страница 17: ...17 Commissioning and adjustment Commissioning and adjustment cont 5675 869 GB Commissioning ...
Страница 22: ...22 0002 0003 0005 0007 0006 0001 0008 0009 0010 Fig 11 Parts lists Electrical equipment 5675 869 GB Components ...
Страница 24: ...24 0002 0003 0001 Fig 12 Parts lists Connection set 5675 869 GB Components ...