Checking the nozzle pressure
A
Test connector
B
Protective cap
C
Phillips screw
D
Hexagon screw
1.
Close the gas shut
‐
off valve.
2.
Remove the screw inside test
connector
A
and connect the
pressure gauge.
3.
Open the gas shut
‐
off valve.
Start the boiler.
4. Activate the emissions test switch
"
S
" (full load):
&
For Vitotronic 100, type KC4
and Vitotronic 200, type KW5:
Press
O
and
F
simulta-
neously for approx. 2 s.
&
For Vitotronic 100, type GC1
and Vitotronic 300, type GW2:
Set the emissions test switch to
"
Æ
".
5.
Test the nozzle pressure at full
load.
In case of deviation from the
value in the table on page 12:
&
Remove protective cap
B
.
&
Counter Phillips screw
C
.
&
Adjust the nozzle pressure at
hexagon screw
D
(turn clock-
wise
—
nozzle pressure rises).
6.
Record the setting values in the
service report on page 32.
7.
Pull plug
‐
in connector
lÖ
apart
(partial load).
Further details regarding the individual steps
(cont.)
10
Initial start-up, inspection, maintenance
5692
647
GB
Содержание GS1B
Страница 29: ...Parts lists cont 29 Parts lists 5692 647 GB ...
Страница 30: ...Parts lists cont 30 Parts lists 5692 647 GB ...
Страница 31: ...Parts lists cont 31 Parts lists 5692 647 GB ...
Страница 37: ...37 5692 647 GB ...
Страница 38: ...38 5692 647 GB ...
Страница 39: ...39 5692 647 GB ...