15
1.
2.
1.
For filling (with heating water), open
the check valve in the heating
return by positioning the slot of the
screw in the vertical position.
Note
Observe the marking on the adjust-
ing screw.
2.
For operation, position the slot of
the screw in the horizontal position.
Filling the system
5443 825 GB
Содержание Divicon Series
Страница 4: ...4 Removing the thermal insulation 3 2 4 1 Preparing for installation 5443 825 GB ...
Страница 6: ...6 Fitting a single module without manifold 1 2 Ø 10 Wall mounting 5443 825 GB ...
Страница 7: ...7 1 2 A B A Heating flow B Heating return Wall mounting cont 5443 825 GB ...
Страница 13: ...13 Wall mounting cont 5443 825 GB ...
Страница 14: ...14 Low loss header if supplied 1 3 4 2 A Heating flow B Heating return Wall mounting cont 5443 825 GB ...
Страница 16: ...16 Low loss header if supplied 1 3 2 Fitting the thermal insulation 5443 825 GB ...
Страница 17: ...17 Manifold 1 2 Fitting the thermal insulation cont 5443 825 GB ...
Страница 19: ...19 2 3 1 Fitting the thermal insulation cont 5443 825 GB ...
Страница 21: ...21 2 3 1 4 Fitting the thermal insulation cont 5443 825 GB ...