6
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
1. Information on maintenance work
....................................................................................
8
•
2. Checking the high limit safety cut-out setting
................................................................
8
•
3. Filling the heating system with water and venting
.........................................................
8
•
4. Filling the trap with water
..................................................................................................
8
•
•
•
5. Commissioning the system
...............................................................................................
9
•
6. Checking the gas type
....................................................................................................... 10
•
7. Converting to natural gas LL
............................................................................................ 10
•
•
•
8. Checking static pressure and supply pressure
.............................................................. 11
•
•
•
9. Checking the CO
2
content
................................................................................................. 12
•
•
•
10. Checking the CO content
•
•
•
11. Checking the flue gas temperature
•
•
12. Checking the ionisation current
....................................................................................... 14
•
•
13. Shutting down the system
................................................................................................. 14
•
•
14. Opening the boiler door
..................................................................................................... 15
•
•
15. Separating the neutralising system from the boiler, connecting the drain hose
......... 16
•
•
16. Cleaning the combustion chamber and heating surfaces
............................................. 17
•
•
17. Checking the gaskets and thermal insulation sections
................................................. 17
•
•
18. Checking all connections on the heating water side for tightness
............................... 17
•
•
19. Cleaning and reconnecting the condensate drain system
............................................. 17
•
•
20. Checking the condensate drain and neutralising system (if installed)
......................... 18
•
•
21. Checking the burner gauze assembly
.............................................................................. 18
•
•
22. Checking the ignition and ionisation electrodes
............................................................ 19
•
•
23. Cleaning the burner
........................................................................................................... 19
•
24. Installing the burner
........................................................................................................... 20
•
•
25. Closing the boiler door
...................................................................................................... 20
•
•
26. Automatic tightness test on the two gas train valves
.................................................... 20
•
•
27. Checking the filter element in the gas line (if installed) and replacing if required
•
•
•
28. Checking all gas connections for tightness
.................................................................... 21
•
•
•
29. Checking the rotary damper setting
................................................................................. 21
•
30. Performing final checks
..................................................................................................... 22
•
•
31. Checking the water quality
................................................................................................ 22
•
•
•
32. Checking the function of the safety valves
•
•
•
33. Checking the temperature controller setting if a building management system is
used (DCC system)
............................................................................................................ 22
•
•
34. Checking the expansion vessel and system pressure
................................................... 22
•
•
35. Checking the flue gas collector for tightness
................................................................. 23
•
•
36. Checking the mixer for ease of operation and leaks
...................................................... 23
•
•
•
37. Checking the thermal insulation for firm seating
•
38. Checking the flue system for leaks
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5783 337 GB
Содержание CT3U
Страница 40: ...40 Burner control unit flow chart Burner control unit flow chart cont 5783 337 GB Diagnosis ...
Страница 61: ...61 5783 337 GB ...
Страница 62: ...62 5783 337 GB ...
Страница 63: ...63 5783 337 GB ...