20
1.
Insert two M 8x16 screws each into
the top of front fixing rails
A
, then
hook the rails onto the boiler floor at
the holes provided and secure with
screws.
Front fixing rails
A
may be secured
onto the lower part of the base sup-
port using M 6x10 screws.
2.
Secure both retaining brackets
C
onto the back of the boiler with
M 8x16 screws.
3.
Position both cross braces
B
onto
front fixing rails
A
and onto retaining
brackets
C
from the inside and
secure with M 8x16 screws.
Note
Check fixing rails
A
and retaining
brackets
C
for squareness towards
cross braces
B
; possibly realign retain-
ing brackets vertically.
Fitting the thermal insulation
(cont.)
5614 451 GB
Содержание CT3B
Страница 11: ...11 2 3 5 1 6 9 1 4 Assembly when supplied in sections 5614 451 GB ...
Страница 17: ...17 Thermal insulation mat front 1 Fitting the thermal insulation cont 5614 451 GB ...
Страница 38: ...38 5614 451 GB ...
Страница 39: ...39 5614 451 GB ...