Opening the heat pump
Danger
Contact with 'live' components
can lead to severe injury from
electric current.
Never touch
terminal areas
(heat pump control unit and
power connections; see
page 72).
Danger
The absence of component
earthing can lead to serious injury
from electrical current and to
component damage if an electri-
cal fault occurs.
Always
reconnect the earth con-
ductors.
!
Please note
Wait
at least 30 min
between the
installation and commissioning of
the appliance to prevent equip-
ment damage.
Work on the
refrigerant circuit
must only be carried out by a
qualified
refrigeration engi-
neer
.
1.
Remove front panel in reverse order;
see page 103.
2.
When work is complete, close the
heat pump; see page 103.
Regarding commissioning this
appliance, see also the operating
instructions.
Writing reports
Enter measurements taken during com-
missioning (described in the following)
into the reports from page 146
onwards.
Commissioning, inspection, maintenance
Further details regarding the individual steps
5600 161 GB
Содержание BW 01.A06
Страница 65: ...65 Removing the top panel 1 Installation sequence Siting the heat pump cont 5600 161 GB Installation ...
Страница 121: ...121 Opening the shield Troubleshooting Repairs cont 5600 161 GB Service ...
Страница 122: ...122 Overview of internal components M C D F E B G O N K P A J I L Troubleshooting Repairs cont 5600 161 GB ...
Страница 166: ...166 5600 161 GB ...
Страница 167: ...167 5600 161 GB ...