5
Vacuum tube collector
■ Do not install the collectors when there
is strong sunlight.
■ When installing in regions where low
temperatures are to be expected, fill
the solar thermal system with anti-
freeze.
Viessmann recommends the following
(see table):
Quantity of antifreeze in %
10
15
20
24
28
30
35
Frost protection temperature in °C
–5 –10 –15 –20
25 –30
–40
The following jobs must only be carried
out by qualified contractors, taking into
account the conditions applicable on site
(see also GB 50057-2010):
■ Connection of collector system to an
existing or new lightning protection
system
■ Provision of local earthing
Danger
Falling objects and tools can lead
to life-threatening accidents.
■ The installation area
must
be
able to support four times the
weight of the filled vacuum tube
collector (for weight, see
page 38).
■ Secure the vacuum tube col-
lector with ropes.
■ Secure tools and equipment
with safety devices.
DHW cylinder
■ The installation area
must
be able to
support four times the weight of the fil-
led DHW cylinder (for weight, see
page 38).
■ A cold water connection and a 220 V
power socket must be available at the
installation site.
■
Danger
Hot steam and water can
escape from the safety valves.
This may cause scalding.
Install a drainage system near
the DHW cylinder. Ensure that
the connection between the
drain lines and the drainage
system does not become
detached.
Preparing for installation
Observe prior to installation
5516 344 GB
Installation
Содержание BS2A
Страница 8: ...8 2 3 1 Installation sequence Installing the collector positioning at 90 cont 5516 344 GB ...
Страница 11: ...11 7 6 Installation sequence Installing the collector positioning at 90 cont 5516 344 GB Installation ...
Страница 12: ...12 8 11 9 10 Installation sequence Installing the collector positioning at 90 cont 5516 344 GB ...
Страница 15: ...15 1 2 3 Installation sequence Installing the collector positioning at 75 cont 5516 344 GB Installation ...
Страница 16: ...16 5 4 6 8 7 Installation sequence Installing the collector positioning at 75 cont 5516 344 GB ...
Страница 19: ...19 12 11 Installation sequence Installing the collector positioning at 75 cont 5516 344 GB Installation ...
Страница 20: ...20 16 13 14 15 Installation sequence Installing the collector positioning at 75 cont 5516 344 GB ...
Страница 25: ...25 4x a b Ø 18 120 Installation sequence Installing the DHW cylinder cont 5516 344 GB Installation ...
Страница 29: ...29 1 7 3 4 2 6 5 8 Installation sequence Connecting the solar lines cont 5516 344 GB Installation ...
Страница 30: ...30 1 2 3 Installation sequence Installing the control unit 5516 344 GB ...
Страница 39: ...39 5516 344 GB Service ...