8
!
Please note
To prevent appliance damage,
connect all pipework free of load and torque
stress.
360
450
730
1925
H
850
100
215
50
a
A B C D EF
K
G
Fig. 1
A
Heating flow Rp
¾
B
DHW Rp
½
(gas condensing combi boiler)
Cylinder flow G
¾
(gas condensing boiler)
C
Gas connection
D
Cold water Rp
½
(gas condensing combi boiler)
Cylinder return G
¾
(gas condensing boiler)
E
Heating return Rp
¾
F
Filling/draining
G
Wiring area
H
Dimension with DHW cylinder below
K
Condensate drain
Rated heating output
kW
Dim. a
mm
3.2 - 19.0
136
6.5 - 26.0
158
8.8 - 35.0
158
Note
This boiler (IP rating: IP X4 D) is approved for installa-
tion in wet rooms inside safety zone 1 according to
DIN VDE 0100. Exposure to water jets must be pre-
vented.
Observe the requirements of DIN VDE 0100.
1.
Fit the pre-plumbing jig or mounting frame provided
at the chosen installation site.
Pre-plumbing jig or mounting frame installa-
tion instructions
2.
Prepare the connections on the water side for the
valves on the pre-plumbing jig or mounting frame.
Thoroughly flush the heating system.
3.
Prepare the gas connection according to TRGI or
TRF [or local regulations].
Preparing for installation
Preparing for installation
5772 980 GB
Installation