20
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checking the power supply
•
2. Filling the heating system
................................................................................................. 21
•
3. Switching on the power supply and the ON/OFF switch
•
4. Selecting the language - only for weather-compensated control units
........................ 22
•
•
5. Setting the time and date - only for weather-compensated control units
.................... 22
•
6. Venting the boiler
............................................................................................................... 23
•
7. Venting the heating system
............................................................................................... 23
•
8. Filling the siphon with water
............................................................................................. 24
•
•
•
9. Checking all connections on the heating water side and DHW side for leaks
•
10. Designating heating circuits - only for weather-compensated control units
............... 24
•
•
11. Checking the gas type
....................................................................................................... 25
•
12. Gas type conversion (only for operation with LPG)
....................................................... 25
•
•
•
13. Checking the static and supply pressure
........................................................................ 25
•
14. Function sequence and possible faults
........................................................................... 26
•
15. Setting max. heating output
.............................................................................................. 27
•
16. Tightness test, balanced flue system (annular gap check)
............................................ 28
•
•
17. Burner removal
.................................................................................................................. 29
•
•
18. Checking the burner gasket and burner gauze assembly
.............................................. 30
•
•
19. Checking and adjusting the ignition and ionisation electrodes
.................................... 31
•
20. Cleaning the heat exchanger
............................................................................................ 31
•
•
21. Checking the condensate drain and cleaning the siphon
.............................................. 31
•
•
22. Installing the burner
........................................................................................................... 32
•
•
23. Checking the neutralising system (if installed)
•
24. Checking the flow limiter (only for gas condensing combi boilers)
............................. 33
•
•
•
25. Checking the expansion vessel and system pressure
................................................... 33
•
•
•
26. Checking the function of safety valves
•
•
•
27. Checking electrical terminals for tightness
•
•
•
28. Checking all gas equipment for tightness at operating pressure
................................. 34
•
•
29. Checking the combustion quality
..................................................................................... 34
•
•
•
30. Checking the flue system for unrestricted flow and tightness
•
•
•
31. Checking the external LPG safety valve (if installed)
•
32. Matching the control unit to the heating system
............................................................ 35
•
33. Adjusting the heating curves (only for weather-compensated control units)
.............. 39
•
34. Connecting the control unit to the LON system – only for weather-compensated
control units
........................................................................................................................ 40
•
35. Calling up and resetting service message
....................................................................... 42
•
36. Instructing system users
................................................................................................... 42
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5772 980 GB