31
1.
Remove nuts from refrigerant con-
nections
C
and
D
and slide onto
the supplied pipe bends.
2.
Flare the pipe ends of the supplied
pipe bends on the short side.
Note
Flare the pipe end of the hot gas line
by approx. 0.5 mm.
3.
Remove the caps on the connections
of the internal unit. Secure the short
side of the pipe bends to the connec-
tions. Fit insulation to prevent heat
and vapour diffusion.
Note
■ The long side of the pipe bends
must point upwards.
■ Pipe bends must not be positioned
diagonally. Check the flared con-
nections for firm seating.
4.
Slide the supplied union nuts
(⅝ UNF for liquid line, ⅞ UNF for hot
gas line) over the open end of the
pipe bends.
Installation sequence
Connecting refrigerant lines
(cont.)
5546 699 GB
Installation
Содержание AWT-AC 241.A04
Страница 19: ...19 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 20: ...20 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5546 699 GB...
Страница 21: ...21 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5546 699 GB Service...
Страница 104: ...104 0010 0009 0007 0002 0004 0008 0001 0005 0003 0006 Parts lists internal unit Casing internal unit cont 5546 699 GB...
Страница 165: ...165 5546 699 GB...
Страница 166: ...166 5546 699 GB...
Страница 167: ...167 5546 699 GB...