48
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 49
•
2. Compiling reports
.............................................................................................................. 49
•
3. Purging the refrigerant lines and the internal unit
.......................................................... 49
•
4. Checking tightness of the refrigerant lines
..................................................................... 49
•
5. Evacuating the refrigerant lines and internal unit
........................................................... 50
•
6. Charging the refrigerant lines and internal unit
.............................................................. 51
•
•
•
7. Checking the refrigerant circuit for tightness
................................................................. 52
•
8. Filling and venting the secondary side
............................................................................ 52
•
•
•
9. Checking expansion vessel and heating circuit pressure
............................................. 54
•
10. Cleaning the DHW cylinder
............................................................................................... 54
•
11. Measuring the anode earth current with an anode tester
.............................................. 55
•
12. Checking the magnesium anode
...................................................................................... 55
•
13. Replacing the magnesium anode
..................................................................................... 55
•
•
14. Checking electrical connections of the internal unit for firm seating
•
•
•
15. Checking the free running of the fan in the external unit
............................................... 56
•
16. Cleaning the external unit heat exchanger (evaporator)
................................................ 56
•
17. Checking thermal insulation of flared connections
•
•
18. Checking electrical connections of the external unit for firm seating
.......................... 57
•
•
•
19. Closing the heat pump
....................................................................................................... 57
•
•
•
20. Switch ON the power
......................................................................................................... 57
•
•
•
21. Starting the heat pump
...................................................................................................... 57
•
22. Commissioning the system
............................................................................................... 58
•
23. Ticking the heat pump type
............................................................................................... 64
•
•
•
24. Checking the heat pump for noise
................................................................................... 64
•
•
•
25. Checking the system function
.......................................................................................... 64
•
26. Instructing the system user
.............................................................................................. 65
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5700 562 GB