
3 Handling
3.1
Assembly information
3.1.1
Mounting conditions
n
Masonry walls
n
Concreted walls
The wall constructions must comply with the regulations in section
„Regulations from section: Fields of application / Mounting condi‐
.
The WC element may only be mounted on even wall surfaces.
With the construction height, the marked height of the upper edge of
the finished floor must be observed.
The WC element can be extended by a remote flush actuation or by an
electronic actuation, as well as by sensitive flush plates. The cables for
these electrical actuation versions must be laid in front of the cladding.
The corresponding empty pipe is required when preparing the remote
flush actuation.
Suitable walls
Construction height
Actuation versions
Handling
Prevista Dry WC element foot fastening at rear side 1120 mm
9 from 24