Clad the module with suitable gypsum cardboard cladding panels.
3.3
Disposal
Separate the product and packaging materials (e. g. paper, metal,
plastic or non-ferrous metals) and dispose of in accordance with valid
national legal requirements.
Handling
Prevista Dry Plus urinal module
12 from 12
Страница 1: ...for wall mounted flushing valve Model Year built 8565 from 12 2018 en_INT Prevista Dry Plus urinal module Instructions for Use...
Страница 2: ...Prevista Dry Plus urinal module 2 from 12...
Страница 3: ...ation 6 2 1 Intended use 6 2 1 1 Areas of use 6 2 2 Product description 6 2 2 1 Overview 6 2 2 2 Compatible components 6 3 Handling 7 3 1 Assembly information 7 3 1 1 Installation dimensions 7 3 2 Ass...
Страница 4: ...uctions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and advisory texts are...
Страница 5: ...Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant na...
Страница 6: ...iption 2 2 1 Overview Fig 1 Components and scope of delivery 1 Urinal module 2 Screws for fixing in support profile 3 slot nuts 4 Assembly accessories wall plates 5 Threaded rods and protective caps f...
Страница 7: ...3 Handling 3 1 Assembly information 3 1 1 Installation dimensions NBY Handling Prevista Dry Plus urinal module 7 from 12...
Страница 8: ...ure the module onto the open mounting rail with the slot nuts supplied Insert the slot nut into the opening of the module Push the slot nut in until it engages Set the height of the rails Handling Pre...
Страница 9: ...nut Bend the sides of the metal bars of the rails Bend the sides of the metal bars of the fitting holder Bend the sides of the metal bars of the drain elbow 25 Nm Handling Prevista Dry Plus urinal mo...
Страница 10: ...t the height of the module according to the ceramic manufactur er s instructions The projection of the carriers beyond the rails is maximum 1 5 mm 9 9 Handling Prevista Dry Plus urinal module 10 from...
Страница 11: ...e nuts of the threaded rods with a fork spanner Place the protective caps on the threaded rods Make the water connections Cut out the recesses for the drain elbow and the threaded rods Cut the gypsum...
Страница 12: ...ard cladding panels 3 3 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements Handling...