
Adjust the construction height of the element in accordance with the
on-site marking of the upper edge of the finished floor.
Tighten the feet of the element using a fork spanner (size 13).
Align the depth of the element.
n
X4: depending on the element used.
Mark the fixing points on the floor.
Remove the element and drill the floor holes.
Insert the dowels.
Fix the element in the floor.
9
9
9
煼
Handling
Prevista Dry fixing set
9 from 11
Содержание Prevista Dry 8573
Страница 2: ...Prevista Dry fixing set 2 from 11...