3 Handling
3.1
Assembly information
3.1.1
Mounting conditions
The following requirements exist for the mounting of the equipment set:
n
The bathtub is fully installed.
n
A Multiplex Trio drain and overflow is installed.
n
All other tasks on the building site have been completed.
3.1.2
Required tools and materials
The following tools are required for mounting:
n
slotted screw driver
No additional material is required for the complete mounting of the
product.
3.2
Assembly
3.2.1
Mounting equipment set
To avoid damage to the rosette and valve cone, only mount the equip-
ment set after finishing all other work on the building site. Proceed as
follows:
Place the flange cover onto the inlet flange with the straight side
facing downwards and affix.
Align and fit rotatable rosette.
Fit valve cone.
Turn rotatable rosette to check function and alignment.
The opening of the valve cone should be 2–3 cm wide when
opened. If necessary, regulate the width of the opening of the valve
cone using the adjusting screw (see next step).
Tool
Material
Handling
Multiplex Trio equipment set Visign MT3