background image

3

Handling

3.1

Assembly information

3.1.1

Required material and tools

The following tools are required for mounting:

n

cutting knife

n

Fork spanner (size 27)

3.2

Assembly

3.2.1

Insert cartridge valve

Requirements:

n

The pre-wall element has been mounted.

n

The tiling work is completed.

n

The revision opening is freely accessible.

n

The urinal ceramic has been mounted.

Cut into the sticky tape of the shaft cover.

Remove the shaft cover.

Tool

Handling

Urinal flush plate for Prevista Visign for Style 23

7

Содержание 8613.2

Страница 1: ...Instructions for Use Urinal flush plate for Prevista Visign for Style 23 for urinal flushing systems Model Year built from 8613 2 03 2019 INT ...

Страница 2: ...2 Maintenance 5 2 3 Product description 6 2 3 1 Overview 6 2 3 2 Technical data 6 3 Handling 7 3 1 Assembly information 7 3 1 1 Required material and tools 7 3 2 Assembly 7 3 2 1 Insert cartridge valve 7 3 2 2 Mounting the flush plate 10 3 3 Errors faults and remedy 14 3 4 Care and maintenance 14 3 4 1 Care tips 14 3 4 2 Cleaning cartridge valve 14 3 5 Disposal 16 Table of contents Urinal flush pl...

Страница 3: ...nd to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs DANGER This symbol warns of possible life threatening injury WARNING This symbol w...

Страница 4: ...ny e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws stand ards regulations directives and other technical provisions take priority over the German European directives specified in this manual The information herein is not binding for other count...

Страница 5: ...ulations applicable in Ger many Flush flow DIN 3265 Noise class DIN 4109 2 2 Intended use 2 2 1 Areas of use The urinal flush plate is intended for the actuation of flushes in urinals 2 2 2 Maintenance The cartridge valve should be cleaned once a year to ensure fault free operation See Ä Chapter 3 4 2 Cleaning cartridge valve on page 14 Product information Urinal flush plate for Prevista Visign fo...

Страница 6: ...tallation frame 2 3 2 Technical data The product has the following technical data Minimum flow pressure 0 05 0 5 MPa 0 5 5 bar Flush flow see Ä Regulations from section Technical data on page 5 0 3 0 7 l s Noise class see Ä Regulations from section Technical data on page 5 Class 2 Product information Urinal flush plate for Prevista Visign for Style 23 6 ...

Страница 7: ...ize 27 3 2 Assembly 3 2 1 Insert cartridge valve Requirements n The pre wall element has been mounted n The tiling work is completed n The revision opening is freely accessible n The urinal ceramic has been mounted Cut into the sticky tape of the shaft cover Remove the shaft cover Tool Handling Urinal flush plate for Prevista Visign for Style 23 7 ...

Страница 8: ...ision shaft outwards up to the tile level and snap them off Open the shut off with a screwdriver for a few seconds to rinse the pipeline Re close the shut off Remove the seal Grease the sealing elements Y 5s Handling Urinal flush plate for Prevista Visign for Style 23 8 ...

Страница 9: ...ment is properly positioned Place the cartridge valve on straight and carefully screw in fine thread Tightening torque 5 Nm Screw in the cartridge valve size 27 Open the shut off valve Checking for leak tightness N Handling Urinal flush plate for Prevista Visign for Style 23 9 ...

Страница 10: ...e set flush volume Re set the flush volume if applicable 3 2 2 Mounting the flush plate Requirements n The cartridge valve is mounted and set Insert the actuator Observe proper alignment Apply the installation frame Handling Urinal flush plate for Prevista Visign for Style 23 10 ...

Страница 11: ...uator Measure the actuator INFO The actuator must not protrude over the sleeve Take the installation frame and actuator off again Cut the actuator to length 9 9 NN 9 NN Handling Urinal flush plate for Prevista Visign for Style 23 11 ...

Страница 12: ...sleeve over the actuator Secure the sleeve with a 90 clockwise turn Slide the retaining bolt in If necessary remove the retaining bolts again and cut the segments to length Slide the retaining bolt in as far as it will go 煉 Handling Urinal flush plate for Prevista Visign for Style 23 12 ...

Страница 13: ...n the retaining bolts by 90 in a clockwise direction To fix the retaining bolts turn safety rings in a clockwise direction Mount the flush plate The flush plate is mounted Handling Urinal flush plate for Prevista Visign for Style 23 13 ...

Страница 14: ...alve dirty or dam aged Clean the cartridge valve if neces sary replace it Ä Chapter 3 4 2 Cleaning car tridge valve on page 14 3 4 Care and maintenance 3 4 1 Care tips Use normal soap or a mild cleaning agent for regular care and preven tion of lime scale on the flush plate Under no circumstances should scouring agent or scratching objects be used Strong stains can be removed using typical househo...

Страница 15: ...safety rings 90 anti clockwise Turn the retaining bolts 90 anti clockwise Turn the sleeve 90 clockwise to unlatch it Loosen the installation frame 煉 Handling Urinal flush plate for Prevista Visign for Style 23 15 ...

Страница 16: ...Re mount the cartridge valve and the flush plate in accordance with Ä Chapter 3 2 1 Insert cartridge valve on page 7 3 5 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements Handling Urinal flush plate for Prevista Visign for Style 23 16 ...

Страница 17: ...Viega Technology GmbH Co KG service technik viega de viega com INT 2020 07 VPN200178 ...

Отзывы: