Position the element on the floor rail.
If necessary, adjust the foot depth from 50 mm (pre-mounted) to 75
mm.
Pull the foot out and turn by 90°.
Screw the feet together with the support profile.
Adjust the construction height of the element in accordance with the
on-site marking of the upper edge of the finished floor.
n
X with construction height 820: 800 mm
n
X with construction height 980: 960 mm
Attach the element to the support profiles using the screws sup‐
plied.
Mounting in metal support profile
d
9
Y
Y
Handling
Prevista Dry washbasin element 820 – 980 mm
16 from 18