for WC flush plates for PrevistaModel
Year built:
8522.31
from 01/2019
en_INT
Prevista Dry WC element height-adjustable
after installation by the installer
Instructions for Use
Страница 1: ...for WC flush plates for Prevista Model Year built 8522 31 from 01 2019 en_INT Prevista Dry WC element height adjustable after installation by the installer Instructions for Use...
Страница 2: ...Prevista Dry WC element height adjustable after installation by the installer 2 from 29...
Страница 3: ...ical data 8 2 4 Accessories 9 3 Handling 10 3 1 Assembly information 10 3 1 1 Mounting conditions 10 3 1 2 Installation dimensions 11 3 2 Assembly 11 3 2 1 Mounting WC element 11 3 2 2 Connecting conc...
Страница 4: ...sible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning an...
Страница 5: ...me passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws stand ards...
Страница 6: ...ntended use 2 2 1 Areas of use The Prevista Dry WC element is suitable for mounting on masonry wall constructions and support profiles pursuant to the regulations in section Regulations from section F...
Страница 7: ...l 10 Hard foam block 11 Corner valve 12 Revision shaft cover 2 3 2 Compatible components The WC element is compatible with all common WC ceramics even with larger projection barrier free The WC elemen...
Страница 8: ...ection is required to extend the WC element to the shower WC Power must be connected on site 2 3 3 Technical data Small flush volume Factory setting approx 3 l Setting range approx 2 4 l Large flush v...
Страница 9: ...o the installation body or corner mounting on masonry or metal support profile Prevista Dry fixing set model 8573 for single mounting of Prevista Dry elements to the solid wall Prevista Dry Plus fixin...
Страница 10: ...ght the marked height of the upper edge of the finished floor must be observed The WC element has an R inch water connection The WC element can be extended by a remote flush actuation or by an electro...
Страница 11: ...hen mounting multiple WC elements with an interval of 500 mm Viega recommends using a Prevista Dry support bracket model 8570 48 Observe the instructions for use of the support bracket when mounting M...
Страница 12: ...nd mark the fixing points on the floor n X3 375 mm Drill the holes Insert the dowels INFO Mount the Prevista Dry fixing set pursuant to the instruc tions for use for the fixing set Loosen the feet of...
Страница 13: ...th the on site marking of the upper edge of the finished floor n X 1000 mm Tighten the feet of the element using a fork spanner The element is attached to the wall Handling Prevista Dry WC element hei...
Страница 14: ...on the element on the floor rail Fix the feet on the floor rail using the clips Set the height of the element by means of the feet Fix the element with the Prevista Dry Plus Steptec rail connectors Mo...
Страница 15: ...The element is fixed in the Prevista Dry Plus pre wall construc tion Handling Prevista Dry WC element height adjustable after installation by the installer 15 from 29...
Страница 16: ...the support profile Adjust the construction height of the element in accordance with the on site marking of the upper edge of the finished floor n X 1000 mm Attach the element to the support profiles...
Страница 17: ...file Install the site protection of the flush actuation Push the hard foam block over the threaded rods onto the drain pipe Mounting the site protection of the flush actuation Handling Prevista Dry WC...
Страница 18: ...e cover plate Place the press connector on the water inlet Press the connection Seal the threaded connectors of the corner valve Screw the corner valve into the thread side of the Steptec rail con nec...
Страница 19: ...ern INFO Ensure the corner valve is correctly seated Use the lock nut to screw the corner valve and the cistern to one another Remove the protective cap from the water supply hose Screw the water supp...
Страница 20: ...r plate lock by 90 in a clockwise direction Place the revision shaft on the cover plate To remove the revision shaft press in the fixing clips at the side Handling Prevista Dry WC element height adjus...
Страница 21: ...ertically through the bare concrete floor is only possible with the drain elbow model 8095 Art No 713744 The screed height must be at least 85 mm 3 2 4 Set and clad the WC element Mark the contour of...
Страница 22: ...e element with suitable gypsum cardboard cladding panels Re position the hard foam block Tile the WC element Handling Prevista Dry WC element height adjustable after installation by the installer 22 f...
Страница 23: ...cessible n The water supply has been shut off n The ceramic has been mounted Fold the tabs forward Lift the drain valve Remove the drain valve through the revision opening Handling Prevista Dry WC ele...
Страница 24: ...Set the large flush volume at the drain valve Set the small flush volume at the drain valve Handling Prevista Dry WC element height adjustable after installation by the installer 24 from 29...
Страница 25: ...nlock the flushing throttle Set the flush flow at the throttle Lock the flushing throttle 3 2 6 Mounting WC ceramic Mark the insertion depth of the flush pipe and drainpipe Setting the flush flow Hand...
Страница 26: ...Cut the flush pipe and drainpipe to length Deburr the flush pipe and drainpipe Handling Prevista Dry WC element height adjustable after installation by the installer 26 from 29...
Страница 27: ...ush pipe and drainpipe with silicon grease and insert them Mount the WC ceramic Align and secure the WC ceramic 9 Handling Prevista Dry WC element height adjustable after installation by the installer...
Страница 28: ...amic If not use cover plate model 8040 21 3 3 Use Loosen do not remove the fixing screws with fork spanner Adjust the WC ceramic s height Adjusting WC height Handling Prevista Dry WC element height ad...
Страница 29: ...centration of calcium or magnesium salts there is the risk of limescale deposits developing on the inlet and drain valves The valves may have to be replaced depending on the extent of the deposits 3 5...