Requirements:
n
The cistern is fitted into the pre-wall.
n
The pre-wall is tiled.
Remove cistern cover.
Remove and keep the threaded bolts from the cistern cover.
INFO! Only for assembly of the flush plate in cistern 2H or on the
front of cistern 2L.
Press the bow backwards from the mounting of the mechanism.
INFO! Only for assembly of the flush plate on the top of cistern
2L.
Press the bow backwards from the mounting of the mechanism.
Handling
Functional unit
11 from 15
Содержание 8332.3
Страница 2: ...Functional unit 2 from 15...