Position the elements at construction height.
The element can be adjusted continuously from 980–1130 mm.
Align elements.
Mark drill holes (each 4 wall fixings and two floor supports).
Drill holes for the wall fixing and the floor supports.
Hit dowel (10 mm) into the wall and the floor.
Screw elements into the wall, into the floor and together (SW 13).
Connect water and wastewater pipe.
Clad the corner elements with a single layer of IFGP cladding panels
(1 x 12.5 mm).
Line mounting of corner elements
Handling
Viega Eco Plus washbasin corner element
23 from 24