
0
Fig. 2: Mounting scheme with pipe interrupter
It is important that the pipe interrupter is mounted vertically, in the
direction of flow and at least 150 mm above the top edge of the
bathtub.
Observe the local standards and regulations.
Handling
Multiplex Trio F drain/overflow functional unit
10 from 25