Strip 8 mm of the single cores.
Plug the single cores in the respective slot at an angle of approx.
45°.
NOTICE!
Connecting the connection plug to the control too soon will
damage the flushing station.
At this step, do not connect the connection plug to the con‐
trol.
3.2.3
Switching on
The binary inputs of the BMS module must only be controlled from the
building automation via potential-free NO contacts.
The binary outputs of the BMS module (relay contact / NO contact) con‐
trol the inputs of the building automation potential-free, max.
24 V / 100 mA.
3.3
Commissioning
3.3.1
Commissioning the BMS module in a new system
Commissioning of the flushing station is completed.
n
Carry out commissioning of the flushing station, see instructions for
the flushing station.
Put the plug in the yellow socket.
Establish the connection to the control.
Call up the web application.
Activate the BMS module in the configuration menu.
Refresh the page.
ð
The
„BMS module“
appears on the left.
Handling
BMS module binary
11 from 12
Содержание 2241.68
Страница 2: ...BMS module binary 2 from 12...