3.3.2
Mounting the basic unit
Mounting preparation
n
The manifold and actuators have been mounted.
n
The power supply for the basic unit has been prepared.
n
The room thermostats have been mounted and connected.
Required tools and materials:
n
Power drill
n
Ø 6 mm masonry drill, or Ø 3 mm metal drill for mounting the basic
unit to the rear of the manifold cabinet.
n
Screwdriver
n
Two dowels 6 x 30 and screws for wall mounting are comprised in
the scope of delivery.
n
Cables in sufficient length for connecting the room thermostats
NOTICE!
The installation site must be in direct vicinity of the mani-
fold.
Make bore holes spaced at 310 mm.
Use the supplied screws and dowels to mount the basic unit to the
wall.
Handling
Basic unit 24 V
with pump module
11 from 17
Содержание 1247.4
Страница 2: ...Basic unit 24 V with pump module 2 from 17...