background image

Use a pry tool to remove the 4 caps on the stock rails. Use a 12mm socket 
to remove the bolts holding the rails in place. 

3.

Insert 2 rubber bumpers into each front mount, then install the mount to the 
rack using 2 button head bolts, washers, and flange nuts. The mount will 

install on the inside of the rack. Pull the front section of the factory rubber 
in the gutter so you can trim and reinstall on either side of the mount later. 

They will sit inside the gutter on the roof. They are a tight fit with the rubber 
feet, so press the mounts into the gutter and the rubber feet will squeeze 

into it.

4.

Отзывы: