Victaulic VE12 Скачать руководство пользователя страница 5

 

4

 

RECEIVING TOOL

 

The VE12 tool is individually packaged in a
heavy cardboard container. Upon receipt,
check to be certain all necessary parts are
included.

Included should be:
(1) Victaulic VE12 tool
(1) Set of feeler gauges (attached to tool)
(1) Crank
(2) Operating Instruction Manual

If incomplete, contact your Victaulic Distributor 
or the Victaulic Tool Company.

 

PRE-OPERATION 

 

Pipe Preparation

 

For proper tool operation, and production of
proper pipe grooves, carefully observe the fol-

 

lowing pipe preparation tips.

 

1.

 

Pipe ends must be square cut (see column 2

notation on “Standard Roll Groove Specifica-

 

tions -  Steel and other IPS Pipe”, page 9).

 

2.

 

Internal or external weld bead or seams

must be ground flush with the pipe surface

 

extending 2" back from the pipe end.

 

3.

 

The end of the pipe, both inside and out,

must be cleaned of coarse scale, dirt and other

 

foreign material.

 

Foreign material such as coarse scale or dirt might
interfere with or damage the grooving rolls or dis-
tort the groove. Rust is an abrasive material and
will tend to wear out the surface of the grooving
rolls. For maximum grooving roll life, remove for-
eign material and loose rust.

 

TOOL AND PIPE SET UP

 

This tool can be used to groove pipe clamped
in a pipe vise or pipe that is in place.

 

Pipe Vise Set Up

 

The choice of grooving location in the shop or
field should take into account the following fac-
tors:

 

 

Pipe handling requirements

 

 

Working space requirements for the tool 
and pipe

Procedure

 

1.

 

 

 

Securely mount pipe vise (chain type)

on a secure stand or workbench able to
support the tool (16 lbs.), the pipe, and
resist the torque (approx. 20 ft.-lb.)
required to operate the tool. 

 

Pipe vise

should be mounted flush with or overhanging
the edge of the stand or workbench so that
when the tool is mounted on the pipe, the tool
will rotate freely around the pipe and not be

 

obstructed by the bench or stand.

 

2.

 

 Secure pipe in pipe vise. Position the pipe to

overhang the pipe vise approximately 5 - 12" as
shown so that the tool can rotate in an unob-

 

structed manner.

Groove-In-Place Set Up
Previously installed piping may be grooved
with the VE12 providing the piping is securely
supported, depressurized and drained.

 

Pipe hangers must be able to accommodate the
weight of the 16-lb. VE12 plus the manual effort to
operate the tool (approximately 20 ft.-lb. torque)
during grooving.

 

VE12

 

TM-VE12.0743 Rev.A  Page 4  Tuesday, May 29, 2001  6:04 PM

Содержание VE12

Страница 1: ...ating or servicing the VE12 Tool read this Manual and all warning labels on the tools Always wear safety glasses and foot protection If you need additional copies of the manual or have any questions a...

Страница 2: ...hich could result in minor injury product or property damage if in structions including precautions are not fol lowed NOTICE The use of the word NOTICE signifies special instructions which are importa...

Страница 3: ...e certain that all tool parts are properly installed and secured 2 Secure pipe before working Make certain the pipe is secured or otherwise capable of resisting the manual effort to operate the tool t...

Страница 4: ...These tools should be used only for roll grooving pipe designated in the charts clamped in a pipe vise or in place Use of these tools for purposes other than roll grooving or exceeding the maximum pip...

Страница 5: ...roll life remove for eign material and loose rust TOOL AND PIPE SET UP This tool can be used to groove pipe clamped in a pipe vise or pipe that is in place Pipe Vise Set Up The choice of grooving loc...

Страница 6: ...osite directions until they are sepa rated 2 Locate the groove depth gauge attached to the tool which is identified with the pipe size to be grooved 3 Turn the depth stop collar closest to the trunnio...

Страница 7: ...to Advance the Feed Steel and Stainless Steel 0 065 to 0 109 1 65 to 2 76 turn 0 110 to 0 154 2 77 to 3 91 turn Aluminum 0 065 to 0 109 1 65 to 2 76 turn 0 110 to 0 154 2 77 to 3 91 turn PVC 0 113 to...

Страница 8: ...lt in the tool walking off the pipe and causing injury to the operator and bystanders or causing damage to the tool 4 Advance the feed by cranking the feed nut per Feed Rates page 6 Crank the tool ano...

Страница 9: ...After approximately eight hours of opera tion grease the bearings at the two grease fittings on the tool Use a No 2 EP Lithium base grease b On a weekly basis apply a light oil SAE 10W 30 or equivalen...

Страница 10: ...ipe 1 5R mm on 20 50 mm COLUMN 5 Groove outside diameter the groove must be uniform depth for the entire pipe circumference Groove must be maintained within the C diameter tolerance listed COLUMN 6 Gr...

Страница 11: ...blem Possible Cause Solution Unable to close rolls onto pipe Improper adjustment of depth stop collar Turn depth stop collar counterclockwise away from trunnion and reset depth stop collar as describe...

Страница 12: ...reserves the right to change product specifications designs and standard equipment without notice and without obligation TM VE12 0743 Rev A 8 96 Registered Trademark of Victaulic Copyright 1996 Victa...

Отзывы: