![Victaulic 795 Series Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/victaulic/795-series/795-series_installation-and-maintenance-instructions-manual_1013487020.webp)
I-795/906
/ Installation-Ready
™
Knife Gate Valve
/ Installation and Maintenance Instructions
6. TIGHTEN NUTS:
Tighten the hex nuts evenly by alternating sides in a
crossing pattern (as shown in the sequence above) until metal-to-metal
contact occurs at the bolt pads .
NOTE:
It is important to tighten the hex nuts evenly by alternating sides
to prevent pinching of the pipe gaskets . An impact wrench or standard
socket wrench with a deep-well socket can be used to bring the bolt
pads into metal-to-metal contact . Refer to the “Series 906 Helpful
Information” and “Impact Wrench Usage Guidelines” sections .
WARNING
• Visual inspection of each joint is critical.
• Improperly assembled joints must be corrected before the
system is placed into service.
Failure to follow these instructions could cause joint failure,
resulting in serious personal injury and/or property damage.
GOOD
BAD
7. INSPECT PADS:
Visually inspect the bolt pads at each joint to ensure
that metal-to-metal contact is achieved across the entire bolt pad
section .
I-795/906_20
REV_D
Содержание 795 Series
Страница 2: ......
Страница 22: ...This page intentionally blank ...
Страница 23: ...SECTION II Maintenance Removing the Seat Cartridge Installing the Seat Cartridge ...