Chapter 2
Getting Started: Setup and Operation
Upon Receipt
Rev. 001
CX300 ComXpert Operation Manual
22130634
2 - 2
February, 2022
2.1 Upon Receipt
This section describes tasks that should be completed when a CX300 ComXpert is
received from the factory.
2.1.1 Unpacking Equipment
VIAVI instruments are shipped using anti-static packing material to stabilize the
components inside the shipping container. Use care not to damage the shipping container
and packaging materials when unpacking the test set. Materials should be stored for
possible future use.
1.
Cut and remove sealing tape on top of shipping container.
2.
Open shipping container. Remove the top foam insert.
3.
Remove the test set and accessories (when applicable) from the shipping
container.
4.
Remove anti-static packaging material from test set.
5.
Unpack the two batteries.
6.
Remove packaging material from the two batteries.
7.
Store packing material and shipping container for possible future use.
2.1.2 Inspect the Equipment
After unpacking the components, inspect the items for any possible damage that may have
occurred during shipment. Report any damages to VIAVI.
•
No signs of physical damage, including dents or scratches.
•
LCD protector – no signs of damage, including scratches or cracks.
•
Indicators (for example, LEDs) – no chips or cracks.
•
Ports – should firmly hold attached cable plugs in place.
•
Cables – no nicks or signs of fraying.
•
Cable plugs – should not be loose or damaged.
NOTE
See section 8.2, “Shipping Instructions”, on page 8-2
for information and
instructions for shipping the equipment.