background image

 

 

 
 

The  final  step  to  assembling  a 

Goal

  is  to  mount  all  of  the  1x1  Snap  Pins  to  the  lower  face  of  the  bottom  corner 

connectors. These corner connectors will be used to attach the 

Goal

 structure to the 

Playing Field

. Once this step is 

complete, a second complete 

Goal 

structure needs to be built. 

 
Note: If practicing directly on a tile, hardwood, linoleum, or similar non-Official 

VEX IQ Challenge

 

Playing Field

, the 

(20x) 1x1 Snap  Pins shown in this step do not have to be added to the bottom of the 

Goal.

 These Snap Pins are 

only used to attach the 

Goal

 to the 

Playing Field.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Содержание Add It Up

Страница 1: ......

Страница 2: ...ent and are also important for field assembly This document is divided up into four sections 1 Field Overview 2 Field Bill of Materials 3 Field Specifications 4 Field Assembly Instructions There is al...

Страница 3: ...t 228 2550 with integrated mounting holes for VEX IQ structural elements The field is divided in half by a center structure consisting of four elevated scoring Goals and a horizontal Hanging Bar Sprea...

Страница 4: ...Note The center of the balls and rings are aligned using the edges of the floor tiles and or the rows of the mounting pin holes as a reference guide...

Страница 5: ...IQC Full Field 4ft x 8ft Tiles Perimeter Set 199 98 228 3051 VIQC Half Field 4ft x 4ft Tiles Perimeter Set 99 99 199 98 228 2984 ALL Official VEX Add It Up Game Elements Contains All Game Elements for...

Страница 6: ...cal dimensions are included in this section it may be necessary to consult the field assembly drawings for an additional level of detail Field components may vary slightly from event to event This is...

Страница 7: ...ents and 4x corner wall segments Each floor tile is 1 foot 305mm square and molded in a very light grey plastic Black lines 1 inch 25 4mm wide for a sign over the top of the tile these lines are used...

Страница 8: ...ld is composed of 32x 1ft square tiles These tiles are arranged in a rectangle that is 4x tiles wide by 8x tiles long A 2 1 2 wall is assembled to the outside of these tiles All floor tiles and wall s...

Страница 9: ...agon to opposite pentagon The ball weighs approximately 50 grams 0 11 pounds The Large BuckyBall is a hollow plastic truncated icosahedron with a diameter of approximately 127mm 5 0 inches from pentag...

Страница 10: ......

Страница 11: ...e comprised of sheets of clear 1 16 inch 1 6mm thick polycarbonate plastic sheet held together using VEX IQ elements The goal structure is attached to the playing field via 1x1 Snap Pins The pair of g...

Страница 12: ...f Goal structures are used to capture and support the Hanging Bar The Hanging Bar is a 44 7 8 inch 1140mm long piece of inch diameter PVC pipe The bottom of the Hanging Bar is 10 inches 254mm above th...

Страница 13: ...re is to begin snapping the Chassis Corner Connectors to the Tall Goal Wall These Corner Connectors will be used to attach the sides of the goal together and to attach it to the floor Take note of the...

Страница 14: ...The second step to assembling the Goal structure is to begin snapping the Chassis Corner Connectors to the Short Goal Wall Take note of the orientation of the Chassis Corner Connectors...

Страница 15: ...third step of assembling the goal structure is to attach the two 2x Wide 2x2 Corner Connectors to the Inner Goal Wall Take careful note of the orientation of the Corner Connectors and the Inner Goal W...

Страница 16: ...The fourth step to assembling the goal structure is to take the smaller assemblies created in steps 1 through 3 and combine them together...

Страница 17: ...tructure to the Playing Field Once this step is complete a second complete Goal structure needs to be built Note If practicing directly on a tile hardwood linoleum or similar non Official VEX IQ Chall...

Страница 18: ...e the Hanging Bar in between the two Goal structures Each Goal has a 27mm 1 06 inch hole on one side the PVC pipe is inserted through this hole The Hanging Bar is captured in place by the end walls of...

Страница 19: ...g Bar structure onto the assembled Playing FIeld The 1x1 Snap Pins on the bottoms of the goals will align to specific clusters on the floor tiles The next page has more detailed close up top views of...

Страница 20: ...ng Bar structure are highlighted in green The locations where the Goals are snapped onto the field tiles are highlighted in blue The four highlighted floor tiles are located in the center of the long...

Отзывы: