Rev. 3/27/2018
FRA-4-238, MANUAL
Copyright 2018 Vestil Manufacturing Corp. Page 3 of 5
Exploded Parts Diagram and Bill of Materials
Item Part
no. Description
Qty.
1 47-514-019
Weldment, frame
(“Receiver”)
2
2 99-145-055
1
/
4
” quick link
2
3
47-014-034 Frame, reel rod
1
4 99-145-026
3
/
16
” x 72” safety chain
2
5 08-145-008
Snap
hook,
1
/
4
” 2
Using the lifter kit
1. Mount the receivers near the tips of the forks.
The tip of each fork will fit between the cross
bars of a receiver.
2. Attach the safety chains to the fork carriage
without slack. For instance, wrap the chains
around the carriage and attach the snap hooks
to the chain. Confirm that the receivers cannot
slide off of the forks by trying to pull them off.
Adjust the length of each chain, if necessary.
3. Slide the reel rod through the center of the
reel/spool of material. An equal amount of rod
should stick out of the core of the reel on both
sides.
4. Drive the forklift to the reel. Lower the forks so
that the receivers are below the reel rod. Adjust
the position of the forklift and raise the forks.
The rod must drop into the receiver slots.
5. Carefully elevate the forks and lift the reel a few
inches above the ground. Travel to the
unloading site. Brake gradually and avoid sharp
turns.
6. To dismount the reel, simply reverse steps 1-4.
Cross bar
Mouth