ASSEMBLY INSTRUCTIONS  

Numbers in parentheses () correspond to parts numbers in the 

EXPLODED VIEWS

 on pages 

4

 & 

5

.  

   

Tighten all bolt-and-nut connections to

 

50-

52ft∙lb

 with a torque wrench. For anchoring hardware (bolts, 

sleeves, etc.) follow the installation and tightening instructions of the hardware manufacturer. 

Unit conversions: 

1” = 2.54cm         2.2 lb. = 1kg.

 

 

     WARNING

 

If the crane is improperly assembled, it might malfunction and result in serious personal injuries. Read this 

instruction manual in its entirety before assembling the crane.  

 

ONLY qualified personnel should assemble the crane. 

 

DO NOT 

modify the crane in any way. Unapproved modifications might make the crane unsafe to use 

and automatically void the 

LIMITED WARRANTY

 on p. 14. 

 

DO NOT

 use the crane if you notice that the beam, upright, tie rod, and/or base frame are damaged.  

Damage might weaken the crane and result in crane collapse.   

 

DO NOT

 use the crane if any of the hardware (bolts, nuts, yokes, etc.) is damaged or missing. Contact our 

TECHNICAL SERVICE AND PARTS DEPARTMENT

 at (260) 665-7586 to order replacement parts. 

NOTICE

 

 

Modifying the crane in any way automatically voids the 

Limited Warranty

.

 

 

This crane must be sheltered from weather. DO NOT install the crane where it is exposed to the elements.

 

 

Inspect the crane for damage before each use as described in 

Inspections & Maintenance

.

 

 

UU

Step 1

UU

:

 Choose the installation site and anchor 

the base frame to the floor. 

 

 

 

Set the base frame on the floor where it will be 

installed. Mark the floor with the locations of 

the 

6 anchor bolt holes 

in the frame. The frame 

should be anchored to the floor with  six  3/4” 

anchor bolts that are at least 4.5” long.  Install 

anchoring hardware as per the hardware 

manufacturer’s instructions. 

 

 

Step 2:

 Attach the UPRIGHT WELDMENT (28-514-068 or 28-514-071) to the mounting brackets as shown in the 

following diagrams: 1) CJIB-3 & CJIB-6 use 1/2”–13 fasteners: Bolts (13209); washers (33012); and lock nuts 

(37030); 2) CJIB-10 & CJIB-20 use 3/4”–10 fasteners: Bolts (13361); washers (33018); and lock nuts (37039). 

 

 

                                       

 

 

UPRIGHT WELDMENT 

CJIB-3 & CJIB-6: 28-514-068 

CJIB-10 & CJIB-20: 28-514-071 

 

Anchor bolt 

hole  

Upright mounting 

bracket  

Upright mounting bracket  

 

 

BASE FRAME

 

 

 

 

 

Washer 

Washer 

Washer 

Bolt 

Lock nut 

Bolt 

Lock nut 

Washer 

Mounting 

brackets 

Содержание CJIB Series

Страница 1: ...t addressed in these instructions and to order replacement parts labels and accessories call our Technical Service and Parts Department at 260 665 7586 The Department can also be contacted online at h...

Страница 2: ...om Vestil s website as soon as you receive your crane To access the specifications document navigate to this webpage https www vestil com product php FID 527 Click the Product Specifications Table dro...

Страница 3: ...e SPECIFICATIONS section on page 2 Capacity also appears in the LABELING DIAGRAM section of this manual on p 13 as well as on capacity labels applied to the product Keep clear of the suspended load DO...

Страница 4: ...3 8 16 x 1 1 2 HHCS 5 Z PLATED GRADE 5 4 3 28 514 066 WELDMENT JIB I BEAM FRAME 1 11 33008 FLAT WASHER LOW CARBON USS ZINC PLATED 3 8 8 4 28 145 003 ADJUSTABLE YOKE END SMALL 4 12 37030 1 2 13 NYLON I...

Страница 5: ...T GRADE 2 6 3 28 514 069 WELDMENT JIB I BEAM FRAME 1 11 37039 NYLOCK NUT Z PLATED GRADE 2 3 4 10 6 4 28 145 004 ADJUSTABLE YOKE END LARGE 4 12 33012 FLAT WASHER LOW CARBON ZINC FINISH 1 2 12 5 28 014...

Страница 6: ...or missing Contact our TECHNICAL SERVICE AND PARTS DEPARTMENT at 260 665 7586 to order replacement parts NOTICE Modifying the crane in any way automatically voids the Limited Warranty This crane must...

Страница 7: ...e beam bracket of the UPRIGHT Fasten the brackets together 1 CJIB 3 CJIB 6 Bolts 13109 washers 33008 and lock nuts 37024 2 CJIB 10 CJIB 20 Bolts 13209 washers 33012 and lock nuts 37030 Support the fre...

Страница 8: ...cable DO NOT operate a hoist with a twisted kinked or damaged chain or rope DO NOT operate a rope hoist unless the rope is properly seated in its groove LOADING THE CRANE Center the hoist above the ce...

Страница 9: ...efore and after each use including first use unload the crane and inspect the following components 1 I Beam Examine the beam especially the lower flanges for bends cracks and other damage 2 I Beam fas...

Страница 10: ...differences between actual labeling and this diagram contact TECHNICAL SERVICE Replace all labels that are damaged missing or not easily readable e g faded To order replacement labels or to inquire w...

Страница 11: ...s motors hydraulic pumps motor controllers and cylinders It also covers defects in original parts that wear under normal usage conditions wearing parts such as bearings hoses wheels seals brushes and...

Отзывы: