8. Spring.
9. Reservoir
Refitting
For refitting purposes carry out the removal operations but in reverse order respecting the tightening
torque and purge the circuit.
Locking torques (N*m)
Oil pipe joint to the pump:
20 - 25
Brake pump fixing screws to the handle bar:
7 ÷ 10 Nm
Rear drum brake
Once the muffler and the wheel have been re-
moved, follow these steps:
1.Remove the shoe spring using the specific span-
ner.
2. Remove the shoe with the aid of a lever.
3. Refit the new shoes giving a few taps with the
mallet.
4. Attach the spring using the specific pliers.
Specific tooling
020325Y
Brake-shoe spring calliper
LXV 125
Braking system
BRAK SYS - 171
Содержание LXV 125
Страница 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 16: ...INDEX OF TOPICS TOOLING TOOL ...
Страница 26: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 36: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Страница 42: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 71: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 75: ...INDEX OF TOPICS ENGINE ENG ...
Страница 122: ...Conceptual diagrams Engine LXV 125 ENG 122 ...
Страница 146: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 162: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 172: ...Braking system LXV 125 BRAK SYS 172 ...
Страница 173: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 179: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Страница 183: ...INDEX OF TOPICS TIME TIME ...
Страница 184: ...Engine ENGINE Code Action Duration 1 001001 engine from frame removal and re fitting Time LXV 125 TIME 184 ...
Страница 218: ...Seat SADDLE Code Action Duration 1 004003 Saddle Replacement 2 004008 Luggage rack Replacement Time LXV 125 TIME 218 ...