Vertiv™ XTE PTS Series PEIL/PESB Power Transfer Switches Description & Installation Manual
9
Figure 5:
Conduits
Figure 6:
Pad Construction and Preparation
utility
service
conduit
grade
ground rod
approximately 3 in. (8 cm)
6 in.
(15.24 cm)
approximately
5 in. (13 cm)
conduit exiting
toward site
No. 66-44 wire mesh
or equivalent