19. Power and temperature monitoring are fully operational.
20. Perform all installation checks as stated in manuals for SmartRow DCR components:
Liebert PDX/PCW, Liebert iCOM, UPSs and Rack PDUs. Each UPS and Liebert PDX/PCW must
be started before the fire-suppression system can be activated.
8.2 Fire Suppression System Installation Checklist
1. Is permanent 120VAC power available and on?
2. Is the Building Fire Alarm tied in?
Place a check mark next to each, depending on your application.
a. Alarm ______
b. Trouble ______
c. Supervisory ______
3. Is the separately-shipped box (see Figure 8.1 on the facing page) that contains the following
items on site?
a. One (1) Fire-suppression tank
b. One (1) Black Pipe Assembly
c. One (1) Aluminum Fike Nozzle
d. Two (2) Power Sonic Batteries (12V 12AH)
*Note: The local Fire Rep will install these items.
4. Is the Liebert PDX/PCW EPO tied-in?
5. Is the EPO override timer working correctly?
6. Perform EPO test to verify function (application-specific).
7. Is the SmartRow DCR installation complete and the SmartRow DCR operational?
Vertiv
| SmartRow DCR Installer/User Guide |
68
Содержание SmartRow DCR
Страница 1: ...SmartRow DCR 3 to 6 Rack 20 kW N N 1 and 5 to 10 Rack 36 kW N Cooling Units 60 Hz Installer User Guide...
Страница 6: ...Vertiv SmartRow DCR Installer User Guide 6...
Страница 12: ...Vertiv SmartRow DCR Installer User Guide 12 This page intentionally left blank...
Страница 52: ...Vertiv SmartRow DCR Installer User Guide 52 This page intentionally left blank...
Страница 66: ...Vertiv SmartRow DCR Installer User Guide 66 This page intentionally left blank...
Страница 70: ...Vertiv SmartRow DCR Installer User Guide 70 This page intentionally left blank...
Страница 72: ...Vertiv SmartRow DCR Installer User Guide 72 This page intentionally left blank...
Страница 76: ...Vertiv SmartRow DCR Installer User Guide 76 This page intentionally left blank...
Страница 82: ...Vertiv SmartRow DCR Installer User Guide 82 This page intentionally left blank...
Страница 101: ......