5. Place the first DCR Top Plenum-Rack beside the DCR Top Plenum-PDX/PCW, and ensure that
gasket side of the Top Plenum-Rack faces the Top Plenum-PDX/PCW, Figure 4.19 below.
Figure 4.19 Correct orientation of top plenum sections and required side gaskets
NO.
DESCRIPTION
1
Side plate cover (shipped loose)
2
Rack top plenums
3
Gasket
4
PDX/PCW top plenum
Vertiv
| SmartRow DCR Installer/User Guide |
35
Содержание SmartRow DCR
Страница 1: ...SmartRow DCR 3 to 6 Rack 20 kW N N 1 and 5 to 10 Rack 36 kW N Cooling Units 60 Hz Installer User Guide...
Страница 6: ...Vertiv SmartRow DCR Installer User Guide 6...
Страница 12: ...Vertiv SmartRow DCR Installer User Guide 12 This page intentionally left blank...
Страница 52: ...Vertiv SmartRow DCR Installer User Guide 52 This page intentionally left blank...
Страница 66: ...Vertiv SmartRow DCR Installer User Guide 66 This page intentionally left blank...
Страница 70: ...Vertiv SmartRow DCR Installer User Guide 70 This page intentionally left blank...
Страница 72: ...Vertiv SmartRow DCR Installer User Guide 72 This page intentionally left blank...
Страница 76: ...Vertiv SmartRow DCR Installer User Guide 76 This page intentionally left blank...
Страница 82: ...Vertiv SmartRow DCR Installer User Guide 82 This page intentionally left blank...
Страница 101: ......