Figure 2:
Mounting the Distribution Fuse Panel in a Relay Rack or a Cabinet Equipment Rack
Installing Load Distribution Fuses
Refer to “Specifications” on page 7 for any temperature, sizing, and spacing restrictions.
Procedure
1.
Install correctly sized fuses into the fuseholders located on the front of the distribution fuse panel, as
required. If a dummy fuse is installed, first remove the dummy fuse. Install a dummy fuse in all unused
fuse positions. See
2.
Record fuse size, location, and other pertinent information on the pull out label located in a slot on the
front of the distribution fuse panel. See
Figure 3:
Installing Load Distribution Fuses
MOUNTING HARDWARE
12-24 x 3/4" Thread Forming
Hex Head Screw
No. 10/12 Ground Washer
Torque: 65 in-lbs.
Front
Fuse
Fuse
Front
Front
Pull out the fuse label and record the fuse