Vertiv
|
NetSure 502NGFB Installation Manual (Section 6009)
|
Rev. Z
43
List KG GMT Load Distribution Fuse Panel
ALERT!
Check for correct polarity before making connections.
Load and Load Return connections are made to the terminal blocks located on the front of the assembly. These
terminal blocks provide screw compression type terminals, which accept a wire size in the range of 26 to 14
AWG. Refer to
. Recommended torque is 5.0 in-lbs.
NOTE!
“A” Side and “B” Side inputs are strapped in this power system.
Figure 19:
Load Connections (List KG)
“A
”S
id
e
Lo
ad
s
#1
-#
5
“A
”S
id
e
Lo
ad
s
#6
-#
10
“A
”S
id
e
R
et
ur
ns
“B
”S
id
e
Lo
ad
s
#1
-#
5
“B
”S
id
e
Lo
ad
s
#6
-#
10
“B
”S
id
e
R
et
ur
ns
Содержание NetSure 502NGFB Series
Страница 10: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 10 This page is intentionally blank ...
Страница 37: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 37 Figure 14 Controller RJ 45 Ethernet Port ...
Страница 45: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 45 Figure 20 Battery Connections ...
Страница 85: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 85 This page is intentionally blank ...
Страница 86: ...Vertiv com Vertiv Headquarters 1050 Dearborn Drive Columbus OH 43085 USA Section 6009 RZ 2020 ...