background image

 

 

Vertiv™ NetSure™ 211 SERIES -48 VDC Battery Cabinet Installation & User Manual (Section 6023)

 

|

 

Rev. L 

Battery 

Refer to the battery manufacturer documentation for specific battery safety instructions.  The following are 
general guidelines. 

 

WARNING!  

Correct polarity must be observed when connecting battery leads. 

 

 

WARNING!  

Special safety precautions are required for procedures involving handling, installing, and 

servicing batteries.  Observe all battery safety precautions in this manual and in the battery instruction 
manual.  These precautions should be followed implicitly at all times. 

 

WARNING!  

A battery can present a risk of electrical shock and high short circuit current.  Servicing of 

batteries should be performed or supervised only by properly trained and qualified personnel 
knowledgeable about batteries and the required precautions. 

 

The following precautions should be observed when working on batteries: 

 

Follow the recommended PPE requirements per the SDS for the battery to be used. 

 

Batteries are an energy source that can produce high amounts of electrical current. 

 

Remove watches, rings, and other metal objects. 

 

Eye protection should be worn to prevent injury from accidental electrical arcs. 

 

Use certified and well maintained insulated tools.  Use double insulated tools appropriately rated for 
the work to be performed.  Ensure that wrenches with more than one working end have only one 
end exposed. 

 

Do not lay tools or metal parts on top of batteries. 

 

Verify that no current will flow when the battery is connected or disconnected by opening battery 
disconnects (if available) or adjusting the system to match battery voltage. 

 

Risk of explosion if battery is replaced with an incorrect type or if polarity is reversed.  
Recommended to replace batteries with the same manufacturer and type, or equivalent. 

 

Dispose of used batteries according to the instructions provided with the batteries.  Do not dispose 
of batteries in a fire.  They may explode. 

 

Batteries may generate explosive gases during normal operation.  Systems containing batteries 
should never be installed in an airtight room or space.  Only install in a ventilated environment. 

 

Batteries may contain sulfuric acid.  If battery acid enters your eye, immediately flush your eye with 
running cold water for at least 15 minutes.  Get medical attention immediately.  If battery acid 
contacts skin or clothing, wash immediately with soap and water. 

 

Do not open or mutilate batteries. 

 

ALWAYS FOLLOW THE BATTERY MANUFACTURER’S RECOMMENDATIONS AND SAFETY 
INSTRUCTIONS. 

Содержание NetSure 211 Series

Страница 1: ...NetSure 211 SERIES 48 VDC Battery Cabinet Installation and User Manual Section 6023 Revision L Specification Number 541434 Model Number 211BC...

Страница 2: ...cifically described in this document The products covered by this instruction manual are manufactured and or sold by Vertiv This document is the property of Vertiv and contains confidential and propri...

Страница 3: ...ription 9 Batteries 9 Specifications 10 Installation 10 Important Safety Instructions 10 General Requirements 10 Mounting the Battery Cabinet 10 Relay Rack Method 11 Wall Method 11 Connecting Battery...

Страница 4: ...ury if not avoided ANSI OSHA This admonition is not used for situations that pose a risk only to equipment data or service even if such use appears to be permitted in some of the applicable standards...

Страница 5: ...o contacting any uninsulated surface or termination use a voltmeter to verify that no voltage or the expected voltage is present Check for voltage with both AC and DC voltmeters prior to making contac...

Страница 6: ...t injury from accidental electrical arcs Use certified and well maintained insulated tools Use double insulated tools appropriately rated for the work to be performed Ensure that wrenches with more th...

Страница 7: ...hould be done determine the hazard risk category and to select proper PPE This product is intended only for installation in a Restricted Access Location Only authorized and properly trained personnel...

Страница 8: ...Vertiv NetSure 211 SERIES 48 VDC Battery Cabinet Installation User Manual Section 6023 Rev L 8 This page is intentionally blank...

Страница 9: ...y chained as shown in Figure 7 to increase the reserve time However a maximum system current of 30 amps should be maintained regardless of the number of interconnected cabinets Figure 1 NetSure 211 Se...

Страница 10: ...e sea level For elevations between 3 000 feet and 10 000 feet derate the maximum operating ambient temperature linearly Overall Dimensions Battery cabinet dimensions are illustrated in Figure 2 Figure...

Страница 11: ...y rack with the provided 12 24 x 1 2 hex head thread forming screws six per side P N 218710500 and 12 ground washers three per side P N 215640600 Torque these connections to 35 0 in lbs Wall Method WA...

Страница 12: ...dapter 4 Mount the battery cabinet to a wall through the two 0 406 diameter holes on the back of the cabinet as shown in Figure 6 If mounting to a stud wall secure the battery cabinet to the studs 5 E...

Страница 13: ...e is no limit to the number of battery cabinets that can be connected together However a maximum system current of 30 A should be maintained regardless of the number of interconnected battery cabinets...

Страница 14: ...l to use these alarm leads to connect the battery cabinet battery disconnect circuit breaker alarm into the power system alarm circuits NOTE Supplied with the battery cabinet is a yellow alarm lead as...

Страница 15: ...ween the batteries Figure 8 Placing Enersys SBS15 Batteries 3 Connect all four Enersys batteries using supplied wires Part Number 541420 crimped with 12 10 AWG ring lug on each end as shown in Figure...

Страница 16: ...es using the buckle strap that is bundled along with the cabinet Installing Fiamm 12SLA12 Batteries Procedure 1 Place the batteries inside the cabinet Refer to Figure 11 2 Insert a spacer between the...

Страница 17: ...5 Refer to Securing the Batteries Using the Strap on page 25 for instructions on securing the batteries using the buckle strap that is bundled along with the cabinet Installing EaglePicher HE 12V12 7F...

Страница 18: ...es 3 Connect all four EaglePicher batteries using supplied wires Part Number 541424 crimped with 12 10 AWG Faston receptacle on each end as shown in Figure 15 Figure 15 Connecting EaglePicher 12V12 7F...

Страница 19: ...s bundled along with the cabinet Installing Eaglepicher HE 12V7 7FR Batteries Procedure 1 Place the batteries inside the cabinet Refer to Figure 17 2 Break each spacer at its score line and insert bet...

Страница 20: ...nals 5 Refer to Securing the Batteries Using the Strap on page 25 for instructions on securing the batteries using the buckle strap that is bundled along with the cabinet Installing Enersys NP18 12FR...

Страница 21: ...binet as shown in Figure 20 Figure 20 Placing the Rear Spacer 2 Take the 3 Inner Battery Spacers and break off the end portion of the spacer where indicated as shown in Figure 21 Figure 21 Break off I...

Страница 22: ...left and one of the fast on lugged cables to the positive terminal off the battery Repeat for third and fourth batteries in the string See Figure 23 Figure 23 Attaching Fast on lug to the Remaining Ba...

Страница 23: ...binet 6 Place inner battery spacer next to battery Make sure that the positive long lead cable is resting on the rear spacer See Figure 25 Figure 25 Placing Battery Spacer 7 Set second battery in cabi...

Страница 24: ...door fastener tabs hanging down and attach the other end of the fast on lugged cable to the negative terminal on the third battery fast on terminal Attach the short wire from the breaker labeled negat...

Страница 25: ...ure 28 Slipping the Strap into the Buckle 3 Then loop the strap into the outer slot of the buckle Refer to Figure 29 Figure 29 Looping the Strap into the Buckle 4 Pull again the strap to tighten 5 Rot...

Страница 26: ...Vertiv NetSure 211 SERIES 48 VDC Battery Cabinet Installation User Manual Section 6023 Rev L 26 Figure 30 Securing the Batteries in the Cabinet...

Страница 27: ...XED CONNECTOR INPUT FROM SUPPLEMENTARY BATTERY CABINETS PIGTAIL CONNECTOR OUTPUT TO POWER SHELF OR MAIN BATTERY CABINET ALARM LEADS TO POWER SHELF C NO NC CB BATT BATT BATT BATT SPACER SPACER SPACER F...

Страница 28: ...re trade names trademarks or registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness here Vertiv Group Corp assumes no responsibility...

Отзывы: