Vertiv | Liebert XDH | User Manual
12
Mechanical Installation (Site Preparation)
Chapter 3: Mechanical Installation (Site Preparation)
This chapter describes the procedures that must be carried out to ensure proper installation of Liebert XDH
system including installation notes, system installation layout, unit piping installation and installation checklist.
And to achieve optimum performance and prolong product life, correct installation is essential.
3.1.Installation Notes
• The XDH needs to be installed in a vertically upright position.
•
The XDH is designed to install with an integrated floor. It should preferably be installed on the room/
equipment room floor or mounted on the false floor as per the server room construction.
•
The XDH should be installed next to the high heat density server cabinet in-line with the most suitable
server rack.
•
Prior to the installation, ensure that the installation preparations have been read and implemented
(refer
for site preparation).
•
Industry-wise standards are followed for the selection, layout, and fixing of the piping.
•
When installing the equipment, follow the design drawings strictly and reserve the space for maintenance,
refer manufacturer’s engineering dimensions drawings for details.
3.2.System Installation Layout
3.2.1.Overall Layout of the System
shows the overall layout of the XDH air conditioning system.
No. Description
No.
Description
1
Two-port valve
3
Fluid reservoir
2
Plate heat exchanger
4
Pump
Figure 3-1 Overall System Layout