Vertiv
™
|
Liebert
®
NXL
™
Power-Tie Controls
| Rev. 6 | 06/2017
10
Table 17
Cable group #32 - from Liebert NXL Power-Tie control terminal block to voltage and current sense points
Terminal Designation
Signal Name
Maximum
Length
From
To
TB7
VOLTAGE &
CURRENT SENSE
POINTS
Critical Load Bus, Phase A CT X1
22-12AWG/
500FT (150m)
TB8
Critical Load Bus, Phase A CT X2
TB9
Critical Load Bus, Phase B CT X1
TB10
Critical Load Bus, Phase B CT X2
TB11
Critical Load Bus, Phase C CT X1
TB12
Critical Load Bus, Phase C CT X2
TB13
UPS SOURCE, Phase A CT X1
TB14
UPS SOURCE, Phase A CT X2
TB15
UPS SOURCE, Phase B CT X1
TB16
UPS SOURCE, Phase B CT X2
TB17
UPS SOURCE, Phase C CT X1
TB18
UPS SOURCE, Phase C CT X2
TB19
TIE BUS VOLTAGE, PHASE A
TB20
TIE BUS VOLTAGE, PHASE B
TB21
TIE BUS VOLTAGE, PHASE C
TB22
NEUTRAL
TB23
CRITICAL LOAD BUS VOLTAGE, PHASE A
TB24
CRITICAL LOAD BUS VOLTAGE, PHASE B
TB25
CRITICAL LOAD BUS VOLTAGE, PHASE C
TB26
NEUTRAL
TB27
BYPASS SOURCE VOLTAGE, PHASE A
TB28
BYPASS SOURCE VOLTAGE, PHASE B
TB29
BYPASS SOURCE VOLTAGE, PHASE C
TB30
NEUTRAL
TB31
FUTURE
TB32
FUTURE
TB33
FUTURE
TB34
FUTURE
TB35
UPS SOURCE VOLTAGE, PHASE A
TB36
UPS SOURCE VOLTAGE, PHASE B
TB37
UPS SOURCE VOLTAGE, PHASE C
TB38
NEUTRAL
F1
UPS Source Power Supply, Phase A
F2
UPS Source Power Supply, Phase B
F3
Bypass Source Power Supply, Phase A
F4
Bypass Source Power Supply, Phase B
F5
Optional Power Supply
F6
Optional Power Supply
Содержание Liebert NXL
Страница 1: ...Liebert NXL Power Tie Controls Installation Manual ...
Страница 20: ...Vertiv Liebert NXL Power Tie Controls Rev 6 06 2017 16 NOTES ...
Страница 21: ...Vertiv Liebert NXL Power Tie Controls Rev 6 06 2017 17 ...
Страница 22: ...Vertiv Liebert NXL Power Tie Controls Rev 6 06 2017 18 ...