
2. Using the provided rigging-fastener kit and the instructions included in the kit, install the
rigging hardware for lifting the unit from the skid. Figure 3.4 below, shows an example of one
of the eye nuts installed.
Figure 3.4 Rigging-fastener eye nut installed
3 Equipment Inspection and Handling
17
Содержание Liebert CW
Страница 1: ...Liebert CW Thermal Management System Installer User Guide 305 kW 375 kW 415 kW Capacity 50 60 Hz...
Страница 10: ...Vertiv Liebert CW Installer User Guide 6 This page intentionally left blank...
Страница 24: ...Vertiv Liebert CW Installer User Guide 20 This page intentionally left blank...
Страница 32: ...Vertiv Liebert CW Installer User Guide 28 This page intentionally left blank...
Страница 34: ...Vertiv Liebert CW Installer User Guide 30 This page intentionally left blank...
Страница 36: ...Vertiv Liebert CW Installer User Guide 32 This page intentionally left blank...
Страница 46: ...Vertiv Liebert CW Installer User Guide 42 This page intentionally left blank...
Страница 48: ...Vertiv Liebert CW Installer User Guide 44 This page intentionally left blank...
Страница 75: ...Vertiv Liebert CW Installer User Guide...